Wattle Glen Train Station
Client: Wamarra
Project Scope
Full in-situ retaining wall package, in-situ pits, spoon drains and post and panel wall


Previous image
Next image
Our experienced management team, capabilities and growing fleet will deliver your next project on time and to budget.
D-Way Constructions provide clients with skilled workforce 24/7 Australia wide, including:
Ranging from heavy plant to equipment we can supply the following on long and short-term projects;
Client: Wamarra
Project Scope
Full in-situ retaining wall package, in-situ pits, spoon drains and post and panel wall
Client: Wamarra
Project Scope
Installation of formwork, preparation and placement of pavements
Client: Gumbuya World
Project Scope
Installation of formwork, reinforcement and pouring of concrete for a suspended slab at Gumbuya World
Client: Downer
Project Scope
Installation of site compound, demolition of existing buildings, footpath installation and minor concrete works
Client: Cycon
Estimated Total Project Cost
$631 Million
Project Scope
Installation of FRP in-situ pits, capping beams, thrust blocks and slabs
Client: Wamarra
Estimated Total Project Cost
$15.8 Billion
Project Scope
Formed and poured slabs, provided labour and plant for earthworks
Client: Bild Group
Estimated Total Project Cost
$16 Million
Project Scope
Installation of 1200mm Dia. drainage package, FRP in-situ pits, associated earthworks.
Client: Symal
Estimated Total Project Cost
$64.2 Million
Project Scope
Installation of drainage package consisting of over 700m of surface pipeline with varying pipe diameters, associated pits and retaining wall package at Berwick Multi Level Car Park.