D-Way Constructions is a team of experienced construction professionals performing a full spectrum of civil and infrastructure services across Victoria.

dway logo mark 01

Our Projects

We have worked on some of the largest Civil and Infrastructure projects in Melbourne.

dway logo mark 01

Built On
Trust Transparency Quality Commitment

Since our humble beginnings D-Way Constructions has developed into a thriving, conventional company having completed many successful contracts for Tier 1 clients. We are focused on delivering our projects safely and to the highest quality.

IMG 4595
IMG 4221
dway logo mark 01

What We Do

Our highly skilled and dedicated team have reliably and safely delivered projects for a range of clients in the Victoria Region. We specialise in the following services:

We've Worked With Some Of The Best!

Complete the form below to access our capability statement.

Wattle Glen Train Station

Client: Wamarra

Project Scope

Full in-situ retaining wall package, in-situ pits, spoon drains and post and panel wall

Preston Level Crossing Removal

Client: Wamarra

Project Scope

Installation of formwork, preparation and placement of pavements

Gumbuya World Theme Park Upgrade Works

Client: Gumbuya World

Project Scope

Installation of formwork, reinforcement and pouring of concrete for a suspended slab at Gumbuya World

Yan Yean Water Treatment Plant Upgrade Works

Client: Downer

Project Scope

Installation of site compound, demolition of existing buildings, footpath installation and minor concrete works

UMA Level Crossing Removal

Client: Cycon

Estimated Total Project Cost

$631 Million

Project Scope

Installation of FRP in-situ pits, capping beams, thrust blocks and slabs

North East Link

Client: Wamarra

Estimated Total Project Cost

$15.8 Billion

Project Scope

Formed and poured slabs, provided labour and plant for earthworks

Upper Ferntree Gully Carpark Upgrade

Client: Bild Group

Estimated Total Project Cost

$16 Million

Project Scope

Installation of 1200mm Dia. drainage package, FRP in-situ pits, associated earthworks.

Berwick Multi Level Car Park

Client: Symal

Estimated Total Project Cost

$64.2 Million

Project Scope

Installation of drainage package consisting of over 700m of surface pipeline with varying pipe diameters, associated pits and retaining wall package at Berwick Multi Level Car Park.